WELLINGTON NORTH – Construction on Wellington Road 109, east of Highway 6 in Wellington North, is scheduled to begin on May 5.
This long-term infrastructure project includes the replacement of four structures and road resurfacing between them, with construction expected to continue through 2028.
The project will commence with work on bridge 10 and culvert 5.
Once these are underway, work will follow on bridge 4 and bridge 6.

Construction on Wellington Road 109, east of Highway 6 in Wellington North, is scheduled to begin on May 5. Submitted image
The construction will be carried out by Graham Bros. Construction Limited of Mississauga. Wellington Road 109 will remain open throughout the construction period, with one lane of traffic maintained at all times.
Lane width will be restricted to 3.5 metres (11 feet) and oversized equipment will need to use an alternate route.
Traffic delays are anticipated, and township officials encourage the traveling public to consider using the suggested alternate route, right, to avoid congestion and improve travel time.
