MAPLETON – A section of Wellington Road 7, between Wellington Roads 11 and 12, is set to be resurfaced by Brantco Construction from Aug. 5 to 29. The road will remain open with one lane of traffic available at all times. Delays are expected and the use of an alternate route is recommended.
Wellington Road 7 open during construction
