Penfold Bridge rehabilitation work begun

Detour ahead – The rehabilitation of Penfold Bridge on Wellington Road 16, approximately 6km north of Wellington Road 19, in Centre Wellington was to begin construction on May 24. The work will be performed by Engineered Concrete Ltd. of Kitchener. Wellington Road 16 will be closed to through traffic at the bridge location from May 24 to Aug. 26. During the closure, traffic will be re-routed per the above detour route.   Submitted map